I arrived the next evening which was Monday the 26th August 2018 not sure what to expect. The dates will make sense shortly.
The GT is finally in colour although still along way off from seeing the road. I removed all the masking and moved the car out of the booth and back to a space (bay was taken by another car).I helped Max move the side skirts, bumpers and rear spoiled into the booth.
While Max was in painting them i made a start on making the car water tight to allow me to move it home in the next day
Nissan Primera GT Bodywork Pt5
Nissan Primera GT Bodywork Pt7