Datsun 180B Engine Bay

This entry was posted in

The parts i put out for powder coating had returned. It was time Open up wide FFJ.

I started by fitting the steering box, column and custom brace. Then the brake and clutch master cylinder with all the pipework and trial fitted and made teh brackets for teh intercooler

Crossmember was fitted to the engine and body was lifted up to all the engine to be slid under then lowered over the engine. Engine was then lifted into place and bolted in.

The rest of the front suspension was fitted before being lowered onto it’s wheels, The rear suspesion was fitted before this phase 🙂

Intercooler fitted along with the lights.

The Cam cover was allso changed to the poweder coated one. More on this later 🙂